INTRODUCTION
The design is only half the work
A sound design can still be built badly. We act on site to verify that materials, workmanship and sequence match the approved documentation and the applicable codes.
Hidden work is recorded by protocol before it is covered. Deviations are raised while they can still be corrected cheaply.
Instruments
What we verify with
Supervision by measurement, not by eye.
INSULATION
Insulation tester
Measuring insulation resistance of cables and windings and confirming compliance with the standard.
EARTHING
Earth resistance tester
Measuring earth electrode resistance and verifying that the protection system will operate correctly.
POSITION
Survey instruments
Checking tower and equipment positions, heights and clearances against the design by measurement.
Type of supervision
Which supervision do you need
Select the role you need us in and send the enquiry directly.
Client-side technical supervision
We act on site as the client’s representative, monitoring the contractor’s quality, schedule and material compliance.
Designer’s supervision
Verifying that the design intent is realised on site and formally approving any change that becomes necessary.
Testing and commissioning supervision
Oversight of equipment testing, protection settings and the completeness of measurement protocols.
Handover to state commission
Compiling hidden work protocols, certificates and test records, and preparing the project for the state commission.