There is no fixed price list in engineering work. What we can do is be open about what the figure is built from.

Basis of calculation

What each type of work is measured by

Knowing these units lets you form your own rough estimate. We set the rate for each unit according to the conditions of the specific project.

TRANSMISSION LINE

Per kilometre of line

Voltage level (35, 110, 220 kV), terrain and tower type all affect the figure.

SUBSTATION

Capacity and number of bays

Transformer capacity, switchgear configuration and equipment count.

SURVEYING

Area or route length

Hectares of site or kilometres of route, and the accuracy class required.

FEASIBILITY STUDY

Scope of the object

Number of options to compare and the depth of investigation required.

SUPERVISION

Duration of works

Months on site and how often our engineer must attend.

ADDITIONAL

Expertise and approvals

State expertise review, permits and coordination with utility owners.

Terms of engagement

How we normally work

These are typical terms. They vary with the nature of the project.

Design · 0.4 – 330 kV

PAYMENT SCHEDULE

30%Advance40%In progress30%On handover

Each stage is signed off with a handover certificate.

2–3 working daysQuotation response time
12 monthsWarranty period
IncludedDesigner supervision
By certificateStage handover

Feasibility · Study and justification

PAYMENT SCHEDULE

40%Advance60%On report handover

Schedule starts once the input data is complete.

3–5 working daysQuotation response time
6 monthsWarranty period
Not applicableDesigner supervision
Written reportDeliverable format

Surveying · Measurement and mapping

PAYMENT SCHEDULE

50%Advance50%On delivery

Field work is scheduled around weather and site conditions.

1–2 working daysQuotation response time
3 monthsWarranty period
Weather dependentField work schedule
Digital + printedDeliverable format

Supervision · Construction supervision

PAYMENT BASIS

ContractMonthly fee agreedMonthlyAgainst progress certificateCommissioningThrough handover

Supervision is contracted monthly and runs through state commissioning.

2–3 working daysQuotation response time
WeeklySite attendance
MonthlyReports and certificates
Until commissioningContract end

Common questions

What clients usually ask

Why is there no price list

Two substations of identical capacity can differ several times over in cost because of terrain, access and permitting. A published figure would mislead more often than it would help.

Can you do part of the work

Yes. Surveying alone, or supervision alone, can be contracted separately.

Is the first consultation charged

No. An initial discussion of the project and the available options costs nothing.

Request a quote

Send us your project details

Tell us the object, voltage level, approximate scope and location. We reply with a written proposal covering scope, schedule and price.