MASTER POINT • ENGINEERING
ENGINEERING SOLUTIONS FOR MONGOLIA’S POWER SECTOR
Power supply design, geodetic surveying and construction supervision from a single team.
220 KV LINES
SUBSTATIONS
SURVEYING
ENGINEERING
2013
Established
100+
Projects delivered
220 kV
Transmission lines
35-220 kV
Substation solutions
What we do
Engineering delivered from one source
From feasibility studies through design, surveying and site supervision.
Surveying
Topographic base maps, cadastral surveys, setting-out and as-built control measurements.
Power system design
0.4–220 kV overhead transmission lines, substations and feasibility studies.
Construction supervision
Professional supervision of power construction works through to state commissioning.
Selected projects
Proven on national infrastructure
Delivered for ministries, provincial governments and development banks.
Sainshand–Tsagaansuvarga 220 kV transmission line and substation extension2022Transmission, substation




