2022
Sainshand-Tsagaansuvarga 220 kV lineTransmission, substationSainshand–Tsagaansuvarga 220 kV transmission line and substation extension205 km of 220 kV overhead line and extension of the 220/35/22 kV Tsagaansuvarga substation, designed for the Ministry of Construction and Urban Development and the Ministry of Energy.
Chinggis Khaan complex power supplyPower supplyChinggis Khaan tourism complex power supplyExternal power supply design for the complex in Dadal soum, Khentii province, covering the 110/35/6 kV Undurkhaan substation, 35 kV line and 15 kV distribution network.
2020
Erdenet distribution networkDistribution networkErdenet city distribution network upgradeUpgrade design for the 6 kV and 0.4 kV networks of Bayan-Undur soum, Orkhon province, under the World Bank financed Energy Project II.